These are photos of a bank in Dallas that we consulted on. This was a complete removal of the existing roof on a mid-rise bank building in Dallas, TX.
A new Soprema insulated roofing system fully adhered to the concrete deck was installed with a granular modified bit roofing system.
This roof of this building was hail damaged and needed to be replaced. The roof system was completely removed down to the concrete deck on this high-rise
credit union building.
A new Soprema insulated roofing system fully adhered to the concrete deck was installed with a granular modified bit roofing system.
This project required a complete removal of both existing roof systems down to the metal deck. We mechanically attached a new Loadmaster insulated roof deck
system and Loadmaster Terminator System with torch down Soprema modified bit granular roof system.
This project required a complete removal of both existing roofs down to the metal deck. The roof system was replaced with a new Loadmaster insulated roof
deck system and a three-ply built up
roof system with gravel. This project also required replacing of the standing seam metal roof and rotten wood decking.
This roof was hail damaged and required replacement, so it was completely removed down to metal deck and replaced with a Loadmaster insulated roof system
and a Loadmaster Terminator System and a modified bit roof system.
Hail damaged the standing seam metal roof and shingle roof on this church facility. All roof materials were completely removed and replaced with new
standing seam metal roof. All flat roof areas were reroofed using modified bit roofing system.
Completely removed old ballasted single-ply roof system down to the concrete deck. Replaced it with a new, fully adhered insulated Soprema torch
down modified bit
roof system.